The 25mm thick weighty steel tube is pushed While using the end shut by a metal shoe. On achieving the necessary driving resistance, a complete duration cage is lowered in for the tube and crammed with superior slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles-in-ban79813.fireblogz.com/63888405/everything-about-cast-in-situ-piles-in-dhaka